TOTAL TYRA REDEVELOPMENT PROJECT

Throwback to 2020 when OSOS International was responsible for setting up the full process of the cleaning, demolition, recycling and disposal of multiple topsides, bridges, flare towers and a jacket with a combined weight of more than 16.000 tons.

The Tyra platform has been a major part of the North Sea’s energy infrastructure for nearly 40 years. Located off the coast of Denmark, the facilities at the Tyra field are key infrastructure as more than 90% of the country’s natural gas are processed and send to shore via the Tyra facilities.

Its redevelopment, which has become necessary due to natural subsidence of the reservoir, was an opportunity to secure and revitalize production. The advanced technologies used enabled reduction of the environmental footprint of the new Tyra and optimized the energy efficiency of its operations.

With this large-scale project, and as a responsible, broad safety partner, OSOS International intend to play its part in supporting the European transition to the low-carbon energies of the future.

Key facts:
First offshore Scandinavian scrapping project
Largest offshore installation recycling project
Circular approach; recycling percentage: 95; CO2 emission reduction percentage: 30
Europe’s first specially designed recycling facility (290.000m2)

OSOS International: your stepping stone partner in safety